On the bench and the re-build begins

After picking up the frame and the panels from Paddy it was time to call on Steve's expertise again. Steve has many years of experience at riding and building scooters and I've learned a lot from him over the time the Joey scooter was worked on.

The scooter on the workbench and the re-build begins
The front fork, hub and brake assembly had to be completely stripped and rebuilt before trying them in place
The rebuilt fork, new front fully adjustable RMS sports suspension and new brake disc is fitted along with the front fender. The main stand is fitted to allow the scooter to stand on its own to allow the build to advance
The wiring loom is put through the frame and battery hooked up to test the current going through the loom
The rear light fitted, fuel lines run through and all cables run through the frame. New rear RMS adjustable sports shock absorber fitted
Click on 'older posts' below right to continue viewing.

No comments:

Post a Comment