After picking up the frame and the panels from Paddy it was time to call on Steve's expertise again. Steve has many years of experience at riding and building scooters and I've learned a lot from him over the time the Joey scooter was worked on.
The scooter on the workbench and the re-build beginsThe front fork, hub and brake assembly had to be completely stripped and rebuilt before trying them in placeThe rebuilt fork, new front fully adjustable RMS sports suspension and new brake disc is fitted along with the front fender. The main stand is fitted to allow the scooter to stand on its own to allow the build to advanceThe wiring loom is put through the frame and battery hooked up to test the current going through the loomThe rear light fitted, fuel lines run through and all cables run through the frame. New rear RMS adjustable sports shock absorber fittedClick on 'older posts' below right to continue viewing.
No comments:
Post a Comment